album:20050401 reflooring |
Up |
evening status Laminate has begun to be laid down in the far left corner. In the foreground are a wet-dry vac and a box of planks. In front of the sliding glass doors is a portable table saw. |
plank edges Glueless click-together system. |
measuring J measures a length of plank to be cut |
corner |