album:20050401 reflooring

Up



evening status
Laminate has begun to be laid down in the far left corner. In the foreground are a wet-dry vac and a box of planks. In front of the sliding glass doors is a portable table saw.

plank edges
Glueless click-together system.

measuring
J measures a length of plank to be cut

corner

Created with the tool album tool a Marginal Hack written by D. Madison on Thu Oct 12 12:40:56 2006